Function Centre.
Concept design, planning documentation. Town Planning by Flex Planning.

Fore completed the concept design of the new Gerard Pavilion at Morphettville Racecourse in 2021. Incorporating the refurbishment of existing buildings, the pavilion delivers two new multi-purpose function spaces for a capacity of 380 and 750 people simultaneously with additional lounge, kitchen, and amenities. The design is envisioned to maximise the expansive views of the hills, and utilise natural finishes.